最新的ISQI ISTQB Certified Tester Advanced Level Test Analyst (CTAL-TA v4.0) - CTAL-TA_V4.0免費考試真題

問題1
You are working on a project to replace an old sales and merchandising system with a new system that will be based on modern platforms. The old system is still in production but is poorly documented and expensive to maintain. The new version will be developed using modern technology. The main requirements for the system are that it shall:
* Load sales data, sent electronically from the stores each evening, into a central database.
* Produce actual sales reports for the merchandisers, whose job is to manage stock levels in stores.
* Produce sales forecast reports based on a combination of sales history and forecasting parameters. The parameters will be entered by the merchandisers into a browser-based front end and the reports will be produced overnight. The users will be able to see the reports next day, on screen or in print, by requesting this through the browser.
Requirements 1 and 2 are satisfied by the existing system and will be rewritten with no significant changes.
Requirement 3 is new and has been clearly specified.
The entry of forecasting parameters and of requests to see the reports will be low volume, but the Merchandising Manager is concerned about usability because the forecasting parameters are complex.
Which test charter would be BEST for the initial exploratory testing of requirement 3?

正確答案: B
說明:(僅 PDFExamDumps 成員可見)
問題2
You are working on a project to build a purchasing system. The main requirements for the system are that it shall:
* Allow users to enter details of items that they wish to have purchased and, from these details, create a purchase request.
* Take each purchase request through a workflow that will allow the requestor's line manager to approve the request, reject it or return it for clarification / modification.
* Forward approved requests to the Purchasing Department.
* Allow purchasers to find the best available supplier for each approved request and place the request on that supplier as a purchase order.
The solution is being developed according to the company's traditional V-model methodology. The requirements are clearly documented and include a business process model.
System testing has finished and the test manager has asked you, the senior TA, to identify any parts of the product that should be focused on during acceptance testing. The results of this may be used to adjust the acceptance test plan.
You are using defect cluster analysis, only counting defects with severity levels 1 to 3, ignoring low severity levels 4 and 5. Function point analysis was used for estimating, so you have used function points as the unit of size for the various functional areas of the product. No numeric estimates of expected defect quantities were made for them individually but, as a result of product risk analysis, these functional areas have been ranked according to the amount of product risk that was predicted in them, with risk ranking 1 being the highest and
5 the lowest; the thoroughness of the testing performed so far has been proportional to that. The results are presented in the table below.
Functional area
Total function points
Product risk ranking
Defects found
Purchase Request entry
2000
2
30
Purchase Request workflow
1500
4
15
Purchase Request authorisation
1000
5
25
Supplier identification
2000
1
30
Purchase Order creation
1000
3
30
Which functional areas would you recommend for more test focus in acceptance testing?
a) Purchase Request entry
b) Purchase Request workflow
c) Purchase Request authorization
d) Supplier Identification
e) Purchase Order creation

正確答案: A
說明:(僅 PDFExamDumps 成員可見)
問題3
The test basis for your latest project contains the activity diagram that is shown below. The business architect has confirmed that this model has been reviewed and approved by the stakeholders.

Which of the following conclusions is correct?

正確答案: D
說明:(僅 PDFExamDumps 成員可見)
問題4
You are working on an Agile project to develop a web-based online dating service that will allow members of the service to enter their profile, meet people who would be a good match for them, arrange social events with those people and to block people with whom they do not want contact.
Functional correctness, usability, performance and security are all important but the major concern for the stakeholders is data protection. Two environments are available for testing: the regular one is similar to the development environment, the other is a pre-production environment which is configured to become the live system when operation begins, but has currently been loaded with a representative volume of artificial profiles.
The features for member profile entry have been delivered and tested. The current iteration will deliver profile matching, which will be done on-demand in response to a request from a member to see matching profiles in their browser. The tests for these user stories' acceptance criteria will be aimed primarily at functional correctness and will be scripted. Performance testing and security testing will be done by external specialists when the functionality is stable.
The other TAs in the team are on sick leave and only have time for one exploratory test session before the end of the iteration. What is the MOST appropriate test charter in these circumstances?

正確答案: C
說明:(僅 PDFExamDumps 成員可見)
問題5
The following decision table shows the rules for sending a package. Same day delivery will not be provided for big packages. All combinations of same day delivery and international destination have been removed as they are infeasible.

How many columns will the table have after all possible minimization has been performed?

正確答案: A
說明:(僅 PDFExamDumps 成員可見)

專業認證

PDFExamDumps模擬測試題具有最高的專業技術含量,只供具有相關專業知識的專家和學者學習和研究之用。

品質保證

該測試已取得試題持有者和第三方的授權,我們深信IT業的專業人員和經理人有能力保證被授權産品的質量。

輕松通過

如果妳使用PDFExamDumps題庫,您參加考試我們保證96%以上的通過率,壹次不過,退還購買費用!

免費試用

PDFExamDumps提供每種産品免費測試。在您決定購買之前,請試用DEMO,檢測可能存在的問題及試題質量和適用性。