最新的Microsoft Software Testing with Visual Studio - 70-497免費考試真題

問題1
You are using Microsoft Visual Studio 2012.
A requirement has been removed and you need to update the five corresponding test cases to reflect this by changing their state.
You need to simultaneously update the state of these five test cases.
What are two possible ways to accomplish this goal? (Each correct answer presents a complete solution. Choose two.)

正確答案: B,C
問題2
You are the product manager for Contoso, Ltd. You are using Microsoft Visual Studio to develop a new product.
Management wants to extend the audience for the new product to include Windows 8 devices. The development team creates an alpha copy of the application for initial testing. A main requirement is to test the application on a device that has never been used for testing.
You need to configure the device for testing after installing the remote debugger.
Which application should you use?

正確答案: D
說明:(僅 PDFExamDumps 成員可見)
問題3
HOTSPOT
You are a development operations engineer. You are a member of the development team and are working on Project A.
You are in the middle of a Sprint 5.
The developers assign work items that instruct you to make changes to config files for web services. The development team needs to add a new functionality to the web services during the sprint.
You need to query the work items assigned to you that are related to the new functionality.
Which filters should you configure in order to build a flat list of work items? To answer, configure the appropriate options in the dialog box in the answer area.

正確答案:
問題4
You are using Microsoft Test Manager (MTM). Your development team is using Team Foundation Server (TFS) 2012 to associate requirements with source code and to automate builds.
Your team has been testing against an old build. You want to assign a more recent automated build to the test plan.
You need to review the requirements that have been affected between the current build and the new build before assigning it to your test plan.
What should you do?

正確答案: A
問題5
Your team uses the Microsoft Visual Studio Scrum 2013 process template in Microsoft Test Manager.
Your team wants to link all test cases to the related product backlog item or bug that they test.
You have a test case ID 121 and a product backlog item with ID 79.
What should you do?

正確答案: B
說明:(僅 PDFExamDumps 成員可見)
問題6
DRAG DROP
Your team uses Microsoft Test Manager (MTM) to manage test cases. You have a test plan with test cases organized in multiple test suites. You add a new configuration and associate it to your test plan.
You need to include the new configuration in a test suite as part of the default configurations.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
正確答案:
問題7
You are using Microsoft Test Manager (MTM).
An application that you are responsible for testing has been modified to include a new data entry field. This new field requires testing against a set of known test data.
You need to modify the manual test case to include input and validation data for the new data entry field to meet these requirements.
Which three actions should you perform? (Each correct answer presents part of the solution. Choose three.)

正確答案: C,D,E
問題8
You are using Microsoft Test Manager (MTM). You are supporting a set of different
configurations for your product.
You plan to prepare the test plan by assigning the tester for each test case.
You need to configure the test plan to support this requirement.
What should you do?

正確答案: A
問題9
While reviewing a bug in Microsoft Test Manager (MTM), you realize there is no test case covering the bug.
You need to create a test case from the bug, including test steps, and associate it with the test case for future reference.
What should you do?

正確答案: B
問題10
DRAG DROP
You are a software quality manager. Your company is using Microsoft Visual Studio to
develop an application.
Your development team is almost finished with its first iteration. The testing team is
preparing to verify that the product requirements are met.
You need to test the requirements.
Which three actions should you perform in sequence? To answer, move the correct actions
from the list of actions to the answer area and arrange them in the correct order.
正確答案:

專業認證

PDFExamDumps模擬測試題具有最高的專業技術含量,只供具有相關專業知識的專家和學者學習和研究之用。

品質保證

該測試已取得試題持有者和第三方的授權,我們深信IT業的專業人員和經理人有能力保證被授權産品的質量。

輕松通過

如果妳使用PDFExamDumps題庫,您參加考試我們保證96%以上的通過率,壹次不過,退還購買費用!

免費試用

PDFExamDumps提供每種産品免費測試。在您決定購買之前,請試用DEMO,檢測可能存在的問題及試題質量和適用性。